Solar-panel/battery/controller first-pass sizing

A first estimate for a stand-alone (off-grid) system; check the parts' data sheets before buying. Enter decimals or scientific notation, such as 12 or 1.5e3.

Load and system

Sun and losses

Daily solar energy in kWh/m2 for your site and worst month, for example from a solar resource map; it is not the number of daylight hours.

NREL's PVWatts uses 14% for soiling, wiring, mismatch and similar losses.

Lower it for battery charging and controller losses; check the data sheets.

Battery and controller

Days the battery must run the load with no sun.

How much of the battery you will use; Penn State gives 20–80% depending on the battery type.

125% is the factor in Arizona Extension's guide; the IEA recommends 130%.

Enter the daily energy, peak sun hours, days of autonomy and depth of discharge to see the sizes.

No valid result to draw.

Show the steps

Interactive calculation is unavailable until JavaScript loads. The formulas, worked examples and references below remain available.

First-pass sizing of a stand-alone solar system: panel power from daily energy and peak sun hours, battery capacity for days of autonomy and depth of discharge, and charge-controller current.

How to use

Enter the daily energy use, or choose Average power and hours and enter both.

Enter the system (battery) voltage and the peak sun hours for your site in its worst month.

Keep or change the array losses and the charge efficiency.

Enter the days of autonomy and the depth of discharge for your battery type.

Optionally enter a panel rating (and its short-circuit current for a PWM controller), and keep or change the controller margin.

Read the array, battery and controller sizes and the diagram. Copy result copies all three; Reset clears the values and restores the starting ones.

Science

A stand-alone solar system must make, on an average day of its worst month, the energy its load uses, and store enough to ride through days without sun. The sizes follow from three questions: how much energy per day, how much sun, and how many days of storage.

Peak sun hours are the day's solar energy expressed as hours of full 1 kW/m2 sunshine, the condition at which panels are rated. Five peak sun hours means a 100 W panel collects about 500 Wh before losses. Dirt, wiring, mismatch and similar losses take about 14% in NREL's PVWatts defaults, and battery charging and the controller take more.

The battery stores the daily energy times the days of autonomy. Because only part of a battery should be used, the stored energy is divided by the depth of discharge: Penn State gives 20 to 80% depending on the battery type. Dividing watt-hours by the system voltage gives ampere-hours.

An MPPT controller converts the array's power to the battery voltage, so its output current is about the array watts divided by the battery voltage. A PWM controller passes the panels' current straight through, so it is sized from their short-circuit current. Either way a margin of 125 to 130% allows for sunlight brighter than the rating.

Limitations: this is a first pass. It uses one peak-sun-hour figure and one loss figure, ignores panel and battery temperature, tilt, shading and seasonal variation, does not check panel string voltage against the controller, and treats every panel as identical. Confirm with a site-specific solar resource and the manufacturers' data sheets.

Formulas

Daily energy: E = P Ɨ h when the load is given as average power P for h hours per day.

Array power: P_array = E / (H_psh Ɨ (1 - L) Ɨ Ī·_c). H_psh is peak sun hours, L the array losses, Ī·_c the charge efficiency.

Panels: N = P_array / P_panel, rounded up.

Battery: E_batt = E Ɨ N_a / D; capacity = E_batt / V. N_a is days of autonomy, D the depth of discharge, V the system voltage.

MPPT controller: I = k Ɨ P_installed / V, with k the controller margin.

PWM controller: I = k Ɨ N Ɨ I_sc.

Array losses: L = 1 - (1 - L₁) Ɨ (1 - Lā‚‚) Ɨ …, so PVWatts' default parts give 14%.

Examples

1,200 Wh per day, 12 V, 5 peak sun hours, 14% losses, 3 days, 50% depth of discharge, 100 W panels: 3 panels (300 W), 600 Ah at 12 V, 31.25 A MPPT. 279.1 W needed; 7,200 Wh of battery; the 300 W array makes 1,290 Wh on a design day.

Same with 90% charge efficiency: 4 panels (400 W), 41.67 A MPPT. 310.1 W needed; 400 W Ć· 12 V Ɨ 1.25 = 41.67 A, Arizona Extension's own example.

Sensor: 2 W for 24 h, 12 V, 4 peak sun hours, 90% charge efficiency, 3 days, 80% depth of discharge, 20 W panel with Isc 1.31 A: 1 panel, 15 Ah, PWM 1.638 A. 48 Wh per day; 1.31 A Ɨ 1.25 = 1.64 A, Arizona's PWM example.

24 V cabin: 3,000 Wh per day, 4 peak sun hours, 95% efficiency, 2 days, 80% depth of discharge, 400 W panels: 3 panels (1,200 W), 312.5 Ah, 62.5 A MPPT. 918 W needed.

Common mistake: 12 hours of daylight used as peak sun hours: An array less than half the size it should be. At 12 instead of 5 peak sun hours the first example would ask for only 116.3 W.

References

Penn State AE 868: Stand-alone system sizing

PVEducation: Average Solar Radiation

NREL PVWatts Version 5 Manual

University of Arizona Cooperative Extension az1983: Stand Alone Photovoltaic (PV) Systems

IEA PVPS T3-05:1998: Recommended Practices for Charge Controllers

Morningstar: TrakStar MPPT Technology and Maximum Input Power

OpenStax University Physics Volume 2, 9.5 Electrical Energy and Power